![]() Not yet announced the Mega Block details in Trans – Harbour Line. Suburban services on Harbour line and Trans Harbour Line will run as per normal schedule.All 12 rakes will be stabled at Panvel (10 rakes in the stabling sidings and 2 rakes on the Platform).13/ (Friday/Saturday night) onwards night stabling/starting will be done as per schedule time table. Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm during block period. However, Special services will run between Panvel and Kurla (Platform No.8) during the block period.Up Harbour line services for CSMT Mumbai leaving Panvel/Belapur/Vashi from 9.53 am to 3.20 pm and Up Harbour line services for CSMT Mumbai leaving Goregaon/ Bandra from 10.45 am to 5.13 pm will remain suspended.Dn Harbour line services to Vashi /Belapur/Panvel leaving CSMT Mumbai/ Vadala Road from 11.16 am to 4.47 pm and Dn Harbour line services to Bandra/Goregaon leaving CSMT Mumbai from 10.48 am to 4.43 pm will remain suspended.UP and Down mail Express trains running on 6th and 5th Line will be diverted on UP Through line and Down through line between KYN and TNA stations and will arrive destination 10″ to 15″ minutes late.Ĭentral Railway announced another Major Train block, details are here :- Thane Station : Traffic and Power Blocks for launching of FOB Girders at on Midnight of 14/ HARBOUR LINEĬSMT – Chunabhatti / Bandra Dn Harbour Line (11.40 am – 4.40 pm)Ĭhunabhatti / Bandra – CSMT Up Harbour Line (11.10 am – 4.10 pm).Thane – Kalyan 5th and 6th Lines (01.00 am – 04.00 am)ĭiversion of Up an Dn Mail/Express Trains The project will culminate in a 24-hour Mega Block on November 4th/5th, 2023, at Bandra Terminus, facilitating the cut-and-connect of rail tracks. 9 will be suspended from October 19/20 until the completion of Non-Interlocking work. As part of the construction, Andheri Platform No. Long-distance trains will also be affected, with approximately 60 cancellations and 200 partial cancellations/short terminations expected. However, starting from October 20, 2023, approximately 2700 suburban services will be cancelled, and around 400 services will be partially cancelled or short-terminated. Notably, there will be no train cancellations during the initial 10-13 days. Despite the extensive nature of the work, meticulous planning has been implemented to minimize disruptions and inconvenience for passengers. ![]() Western Railway has announced a planned 29-day block in the Mumbai suburban section, from Khar to Goregaon, to facilitate the construction of the 6th line. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |